Broadway Corridor


Pic provided by Texas Sterling

BROADWAY CORRIDOR – PHASE 3A

SAN ANTONIO, TEXAS

Arias performed geotechnical engineering and construction materials testing services on the pavement reconstruction and drainage improvements along Broadway Street and E. Hildebrand Avenue. The pavement reconstruction included approximately 1,300 linear feet along Broadway Street that was completely reconstructed, and included the removal of the existing asphalt and base material followed by the preparation of the subgrade and the construction of new pavement. The reconstruction along E. Hildebrand Avenue included both complete pavement reconstruction and pavement mill and overlay with a total length of approximately 1,700 linear feet. Associated with the development were new utilities that included new sanitary sewer lines and water service lines.

Related Projects:

Landa Park Dam Modifications

Landa Park Dam Modifications

Read More

New Lift Station At Lake Dunlap

New Lift Station At Lake Dunlap

Read More

North Tributary Regional Flood Control

North Tributary Regional Flood Control

Read More

Potential Off Channel Reservoir Sites Study

Potential Off Channel Reservoir Sites Study

Read More

Calaveras Dam No. 8 Modifications

Calaveras Dam No. 8 Modifications

Read More

Olmos Dam Rehabilitation

Olmos Dam Rehabilitation

Read More

SARA Martinez Dams 1, 2 And 3

SARA Martinez Dams 1, 2 And 3

Read More

Wastewater Collection System

Wastewater Collection System

Read More

Dry Comal Creek Vineyards And Winery

Dry Comal Creek Vineyards And Winery

Read More

Dry Comal Creek Flood Retarding Structure

Dry Comal Creek Flood Retarding Structure

Read More

San Antonio River Improvements Project—Museum Reach

San Antonio River Improvements Project—Museum Reach

Read More

San Antonio River Improvements Project—Mission Reach

San Antonio River Improvements Project—Mission Reach

Read More
SAWS NACO Pump Station

SAWS—Naco Pump Station Improvements

SAWS—Naco Pump Station Improvements

Read More

Babcock Elevated Storage Tank

Babcock Elevated Storage Tank

Read More
SAWS SARO Pipeline

SAWS–SARO Pipeline Project

SAWS–SARO Pipeline Project

Read More
Regional Carrizo Water Integration Pipeline

SAWS Regional Carrizo Water Integration Pipeline

SAWS Regional Carrizo Water Integration Pipeline

Read More
Water Pipeline and Plant Features

Water pipeline and water features

Water pipeline and water features

Read More

South Central Texas Regional Certification Agency (SCTRCA)
SBE
MBE
HABE
DBE

North Central Texas Regional Certification Agency (NCTRCA)
MBE

City of Austin
MBE

Texas Comptroller of Public Accounts
HUB

MENU