SAWS Regional Carrizo Water Integration Pipeline

Regional Carrizo Water Integration Pipeline


SCHERTZ AND SAN ANTONIO, TEXAS

The Regional Carrizo Project Water Integration Pipeline, for which Arias provided geotechnical engineering services, consists of about 64,000 linear feet of 36-inch diameter pipeline. The project began downstream of the Point-of-Delivery from the Transmission Pipeline located near Buffalo Drive and Elbel Road in Schertz and extended to the SAWS Nacogdoches Pump Station located on O’Conner Road near Nacogdoches Road in San Antonio. Arias explored stratigraphic and groundwater conditions along the alignment at proposed roadway and river crossings by performing single flight auger drilling and geotechnical sampling at 37 test locations.

Related Projects:

South Central Texas Regional Certification Agency (SCTRCA)
SBE
MBE
HABE
DBE

North Central Texas Regional Certification Agency (NCTRCA)
MBE

City of Austin
MBE

Texas Comptroller of Public Accounts
HUB

MENU