SAWS–SARO Pipeline Project

SAWS SARO Pipeline

SAWS SARO Pipeline Project
San Antonio Water System
SAN ANTONIO, TEXAS

The project consisted of the replacement and new installation of approximately 6 miles of 48-inch wastewater main to extend from the southeast quadrant of S.E. Military Drive and Presa Street to the Salado Creek tie-in near the Salado Creek Recycling Center in San Antonio, Texas. The project plans show that sewer piping will be installed in two (2) new siphons and a total of six (6) siphon structures are planned. Geographically, the project area is situated along the east side of the San Antonio River and crosses Salado Creek near the projects south terminus. Arias provided geotechnical engineering services for this project.